Our Service Packages
Upon request, we can tailor our service packages to your specific project requirements and internal processes.
Payment is based on the amount of work performed. The outcome of the maturity assessment process has no impact on the fee.
Analysis of network operator requirements, project maturity assessment, gap analysis with recommendations for action.
All services included in Package S, as well as comprehensive organization of supporting documentation, consistency and plausibility checks, mock scoring, and assistance with the submission process.
All services included in Package M, as well as portfolio support across multiple projects, process support through the network operator’s decision, and an optional retainer for follow-up projects
What is a maturity assessment process for network operators?
Grid operators allocate limited grid connection capacity for PV, wind, and storage projects through a tiered scoring process. Each project is evaluated based on defined criteria: readiness for approval, secured land, grid connection status, and likelihood of implementation. Projects with a sufficiently high score are granted a grid connection or are selected for further review.
Why do technically sound projects fail in the maturity assessment process?
Often this is not due to substantive shortcomings, but rather to formal weaknesses: missing supporting documentation, inconsistencies between the timeline and the approval status, or unstructured applications. Network operators review applications under time pressure. A project that is not immediately understandable loses points before its actual quality even comes into play.
Does netzkontor nord influence the grid operator's decision?
No. We do not interact with the grid operator during the maturity assessment process and do not influence the operator’s evaluation. We ensure that your project can be submitted in the best possible form. We cannot and will not guarantee a specific decision by the grid operator.
At what stage of a project does it make sense to seek guidance?
The earlier we start, the more we can actively optimize. But even shortly before the submission deadline, a targeted review and optimization of supporting documentation can still be effective. This requires that there be sufficient milestones in place so that we can realistically assess the level of maturity.
What is the difference between maturity level consulting and project development consulting?
Project development consulting supports the setup of a project. Maturity assessment consulting evaluates how an existing project fares within a grid operator’s evaluation system. This requires a different perspective: not that of the developer, but that of an outsider, if necessary. Weaknesses that go largely unnoticed internally are often decisive in the scoring process.
Is your next maturity assessment coming up?
Talk to our team. We'll review the status of your project and tell you right away where the biggest valuation risks lie.